8 800 700-50-20
Hour Hotline
8 800 775-20-50
Медицинский пульт
Электронная мед. карта

News

10 december 2012
IBG has paid 162 thousand. Rub. for damage caused by the construction object "Reconstruction of the roadbed on the Volga 853 km railway section Rtishchevo-Saratov", as a result of heavy rain

IBG has paid 162 thousand. Rub. for damage caused by the construction object "Reconstruction of the roadbed on the Volga 853 km railway section Rtishchevo-Saratov", as a result of heavy rain.

The object of construction "Reconstruction of the roadbed on the Volga 853 km railway section Rtishchevo-Saratov" IBG was insured under the insurance contract construction activities and scope of responsibility 32.4 million. Rubles.

6 december 2012
IBG made insurance payment in the amount of 500 thousand. Rub. Voronezh police lieutenant

IBG made insurance payment in the amount of 500 thousand. Rub. Voronezh police lieutenant в связи с получением им инвалидности при исполнении служебных обязанностей.

Cотрудники Муниципального оперативного полка полиции г. Воронежа были застрахованы в IBG в соответствии с Федеральным законом от 28.03.1998 г. № 52-ФЗ "Об обязательном государственном страховании жизни и здоровья военнослужащих, граждан, призванных на военные сборы, лиц рядового и начальствующего состава органов Interior of the Russian Federation, the state fire service, bodies for control over trafficking of narcotic drugs and psychotropic substances, the staff of agencies and bodies of the correctional system. "

3 october 2012
IBG has paid the second part of the insurance indemnity in the amount of 8 million. 464 thousand. Rub. in connection with the damage caused by flooding in the Kuban region, construction of the station in the area of 9 km of the North-Caucasian railway

02.10.2012 IBG has paid the insurance compensation in connection with the damage caused by flooding in the Kuban. The second part of the payment in the amount of 8 million. 464 thousand. Rub. It made for damage produced by construction and assembly work in the construction of the station in the area of 9 km of the North-Caucasian railway.  

Construction of the station 9km North Caucasus Railway was insured within the framework of the project "Integrated development of the Novorossiysk transport hub (Krasnodar region)" in the amount of 12, 361 billion. Rub.

Нажимая кнопку "Отправить заявку", вы даете согласие на обработку своих персональных данных в соответствии с плитикой